你也许有资格卖给我们电力 在谈判的费率和条件,如果你有合格的一代,如风, 太阳能或水力发电,直接连接到电网 合格的成员 北卡罗来纳州电力会员公司. 除非另有商定, 在这些选项下购买合格的能源, 作为生成器所有者的您将维护所有 可再生能源证书 与输出相关联.

什么是资历架构?

Qualifying Facilities are a class of generators recognized under the Public Utility Regulatory Policies Act of 1978 (PURPA).  There are two types of QFs; small power producers up to 80 MW (typically fueled by renewable resources), 或热电联产设施.

如何获得资历架构状态?

An owner or operator of a generating facility with a maximum net power production capacity of greater than 网赌最好最大平台W (1,000 kW) may obtain QF status by either submitting a self-certification to the Federal 能源 Regulatory Commission, 或申请及取得资历架构机构的委员会认证, 并且必须通过填写和电子归档一份 FERC形式不. 556 与欧盟委员会. FERC订单没有. 732 does not require facilities with net capacity of 网赌最好最大平台W or less to make a filing 与欧盟委员会 to claim QF status, 不过,申请上述设施的人士如有需要,可申请核证.

有关详细信息,请参见 www.联邦能源管理委员会.gov /行业/电气/ gen-info / qual-fac.asp.

All Qualifying Facility generator developers that intend to sell energy to NCEMC are fully responsible for adhering to all utility requirements, 适用的联邦法规, state and local ordinances and regulations adopted by the 北卡罗来纳州公用事业委员会.  This website does not establish a legal or binding arrangement; it is intended solely to provide access to general information about potential options that may be available through NCEMC. Generators are responsible for consulting with appropriate legal and energy professionals in determining if generation ownership is the right choice and for assistance in navigating applicable requirements and procedures.

如何销售500千瓦及以上合格发电量的能源

Developers of generators may sell the electricity generated by their renewable sources by directly interconnecting with NCEMC’s members’ electric facilities. Below is a step-by-step outline for interconnecting and contracting to sell energy from a Qualifying Facility with generating capacity 500kW and greater.

Note: The step sequence below is a suggestion intended solely to provide access to general information about potential options that may be available.

Step 1: File the NCUC Report of Proposed Construction or Certificate of Public Convenience and Necessity
所有发电设施必须提交建设建议书, 或超过2兆瓦(MW), receive a Certificate of Public Convenience and Necessity from the 北卡罗来纳州公用事业委员会 (NCUC). This report provides the necessary notification to install a renewable generation facility in the state of North Carolina.

The following information is provided to assist customers in meeting requirements under N.C. General Statutes and is not intended to interpret or replace provisions of any statute or regulation.

你需要知道的

  • The State of North Carolina requires that a Certificate of Public Convenience and Necessity (CPCN) be obtained before a customer commences construction of a generating facility. 看到 N.C.G.S. §62-110.1 完整的文本.
  • Section (g) of the statute exempts facilities under 2 MW that are fueled by a renewable energy resource. 然而, generators that are exempt must provide a Report of Proposed Construction to the NCUC prior to construction.
  • NCEMC requires that all generators intending to sell power to the utility receive appropriate certification or submit a Report of Proposed Construction.

开始:

CPCN需求

NCUC规则r8 - 64 提供信息需要提交a CPCN应用程序. 请将已提交的CPCN申请副本提交至:

电子邮件:
NCEMCRenewables@ncemcs.com 

复印件:
查理·贝里斯
副总裁,高级监管顾问
NCEMC
P.O. 27306箱
罗利数控27611 - 7306

或交付:
3400年萨姆纳大道
罗利数控27616

建议的建造要求报告 (以可再生资源为燃料的2mw以下发电机)

NCUC规则r8 - 65 提供提交拟议建设报告所需的信息.

下面列出的是一个可以修改的空白副本. 邮寄信息包含在报告中,以方便您. 摘要号码必须提供给NCEMC.

参观 NCUC网站 一旦文件提交给委员会,获取摘要编号. 搜索 Tip: 搜索 for the docket number filing in the “All documents by date” section and select “SP-Small Power Producer” in the “For company types” section

NCUC联系方式:

USPS的邮件:
北卡罗来纳州公用事业委员会
4325邮件服务中心
罗利数控27699 - 4325

联邦快递、UPS或其他通宵服务:
北卡罗来纳州公用事业委员会
多布斯建筑
北索尔兹伯里街430号
罗利数控27603 - 5918

第二步:请求批准互连
All generation developers that install renewable generation who intend to interconnect or operate in parallel with the utility grid must adhere to all requirements and conditions of the NCEMC member. Developers that own qualifying generation facilities such as solar and wind will begin the interconnection process by contacting the NCEMC member and then submitting an Interconnection Request to the NCEMC member in which an interconnection agreement is sought.

第三步:提交销售产品的承诺通知
一旦开发人员的发电机满足一定的要求, the “Notice of Commitment to Sell the Output of a Qualifying Facility to NCEMC” form is submitted to NCEMC to establish a legally enforceable obligation (LEO).

第四步:签署互连协议
Execute an Interconnection Agreement with the NCEMC member to which the generator is interconnecting.

第五步:协商电力购买协议(PPA)
PPA确定条件, 合同期限和购买电力的费率.

要开始这个过程,请联系: